Marshall spill: cracks under disbonded tape

The tape had come away. The cracks grew underneath it.

Key facts: Line 6B, 30-inch pipe, Marshall, Michigan, 25 Jul 2010; Polyethylene tape coating had disbonded; Corrosion fatigue cracks grew and coalesced; Fracture about 6 ft 8 in long, near a seam weld; Estimated release 843,444 gallons of crude oil; Release undetected by control centre for over 17 hours

What happened

On 25 July 2010 Enbridge Line 6B, a 30-inch crude oil pipeline, ruptured in a wetland at Marshall, Michigan. The rupture occurred during the final stages of a planned shutdown and was not identified by the control centre for over 17 hours. The estimated release was 843,444 gallons of crude oil, which reached Talmadge Creek and the Kalamazoo River. No fatalities were reported. The NTSB report was adopted with clean-up costs already above $767 million.

What the NTSB found

What it means

Corrosion fatigue needs three things: a corrosive environment at the steel, cyclic stress, and a place for cracks to start. A disbonded tape coating can provide the first and hide it. In our view the engineering lesson is the combination: a crack in a corroded area is not just a crack and not just corrosion, and treating the two as separate indications underestimates how quickly they interact.

The second lesson is about decisions. The NTSB reported that the defects were documented. A documented indication with no repair trigger is a list of future failures.

What an engineer should check

Source. NTSB investigation DCA10MP007, Enbridge Line 6B crude oil release, Marshall, Michigan, 25 July 2010 (report NTSB/PAR-12/01). NTSB investigation page. This article summarises the sources in our own words; see the originals for full details. It is general technical information, not advice on a specific component.