On 13 November 2026 the US Federal Aviation Administration (FAA) published a proposed airworthiness directive for certain GE Passport 20-17BB1A, 20-18BB1A, 20-19BB1A and 20-19BB1B engines. It follows an in-flight shutdown caused by an engine fire.
What the source reports
The FAA received a report that a GE Passport 20 engine gave a fire warning and then shut down in flight. The manufacturer's investigation revealed hot gas leakage at the high-pressure compressor case split line. The gas had eroded a start bleed valve fuel tube, which let fuel leak into the engine core compartment and caused the fire. The manufacturer redesigned the tube to prevent erosion from hot gas impingement.
The proposal would require replacing the affected tube with the redesigned one. The FAA estimates 126 engines installed on aircraft of US registry, at 36 work-hours each.
What it means for asset owners
In our view, the sequence is a useful template for any investigation: first the leak path, then the mechanism that damaged the part, then the design change that stops it. Erosion by a leaking hot gas is a different failure mode from fatigue or corrosion, and the remedy follows the mode.
Source: US Federal Aviation Administration, Federal Register, 13 November 2026.